Tunnelling. A Decade of Progress. GeoDelft 1995-2005

Tunnelling. A Decade of Progress. GeoDelft 1995-2005

Adam Bezuijen, Haike van Lottum
0 / 4.0
0 comments
你有多喜歡這本書?
文件的質量如何?
下載本書進行質量評估
下載文件的質量如何?

Following years of research, the first bored tunnel in soft soil in the Netherlands, the Tweede Heinenoord tunnel, was completed in 1998. Since then, Dutch engineers have increased their knowledge of soft soil tunnelling, with a significant and important part of this research being carried out by GeoDelft, the Dutch National Institute of Geo-Engineering. This book contains the most important publications by GeoDelft on the subject of soft soil tunnelling, focusing on the period from 1992 to the present, it is divided into four main headings: field measurements; grout behaviour; model testing; and numerical analysis. This impressive overview of the progress made in the Netherlands in soft soil tunnelling research over more than a decade is a valuable resource to those working in soft soil tunnelling worldwide.

類別:
年:
2006
版本:
1
出版商:
Taylor & Francis
語言:
english
頁數:
304
ISBN 10:
0415391334
ISBN 13:
9780415391337
文件:
PDF, 26.72 MB
IPFS:
CID , CID Blake2b
english, 2006
線上閱讀
轉換進行中
轉換為 失敗

最常見的術語